Files
amethyst/nestsClient
Claude 116360b004 docs(nests-interop): T16 closure-roadmap Priority 3 closed (CI gating wired)
10/10 sweep × 22 tests = 220/220 hard-pass post-recalibration on
the merged branch (~5m 28s per sweep). Stability bar from
`2026-05-07-cross-stack-interop-ci-gating.md` met; both
`hang-interop` and `browser-interop` jobs in build.yml since
commit `21947bc5`.

Marks Priority 3 closed in:
- `2026-05-07-cross-stack-interop-ci-gating.md`
- `2026-05-07-t16-closure-roadmap.md`
- `2026-05-06-cross-stack-interop-test-results.md` (CI integration § wired)
- `2026-05-06-cross-stack-interop-test-gap-matrix.md` (history notes)

T16 closure roadmap is now done end-to-end:
- Priority 1  closed by `:quic` main merge (commit `8f8251a5`)
- Priority 2  closed by hard-floor tightening (commits `04be38ad`,
  `029329af`, `f8dc9c59`)
- Priority 3  closed by CI yaml + 10/10 stability (commit `21947bc5`)

Open follow-ups remain (browser hot-swap re-attach,
post-reconnect listener cliff, framesPerGroup production rerun)
but none block T16 closure.
2026-05-07 22:59:30 +00:00
..