589ced580c
8 plan files updated to reflect what's actually shipped vs. what each doc said before: - 2026-05-06-cross-stack-interop-test.md: 'Spec — ready to implement' → 'Implemented and merged' with pointers to results, gap matrix, and closure roadmap. - 2026-05-06-cross-stack-interop-test-results.md: scenario inventory updated to show all branches merged into claude/cross-stack-interop-test-XAbYB; suite-flake caveats flagged with cross-refs to the routing investigation; file inventory now lists BrowserInteropTest + PlaywrightDriver + the moved nestsClient/tests/browser-interop/ tree (no more 'in sister branches not yet merged' section). - 2026-05-06-cross-stack-interop-test-gap-matrix.md: T8/T10/T11/ T12/T13 all show hang ✅ + browser ✅; I13/I14 'NOT YET LANDED' callouts removed; the 'in sister branch' qualifier on T13 / I7 / I6 dropped; coverage-holes section replaced with caveat pointers to the routing investigation. - 2026-05-06-i4-stereo-cross-stack-scenario.md: 'Spec — ready for implementation' → 'Landed' with PR #2755 + the three test scenarios that ship the assertion. - 2026-05-06-phase4-browser-harness.md: 'Spec — ready for implementation' → 'Landed', with notes on how the implementation diverged (used Container.Legacy.Consumer not @moq/watch; cert pinning via serverCertificateHashes; I2/I3/I4/I13/I14 originally deferred but later landed). - 2026-05-06-phase4-browser-harness-results.md: status updated to reflect 4.D CI removed per maintainer ask; layout note for the nestsClient/tests/browser-interop/ relocation; full scenario list reconciled with results doc. - 2026-05-07-late-join-catalog-flake-investigation.md: status updated to mention00f6cba31+207057374were reverted, and link to 2026-05-07-moq-relay-routing-investigation.md as the action plan. Adds note that the flake also affects four browser-tier scenarios after Browser I7 landed. - 2026-05-01-quic-stream-cliff-investigation.md: adds an HCgOY- override banner — recommendation 2 (framesPerGroup = 5) was superseded 4 days later by HCgOY field tests landing the prod default at 50. Cross-refs the reconciliation + production- rerun plans. Open follow-up #3 ('reset to 1') updated with the same context. No code or test changes.