Files
amethyst/nestsClient/plans
Claude fd193d6e8b docs(nests): refresh T16 results plan — Phase 3 + I4–I11 + sister branches
Brings the cross-stack interop results plan up to date with what's
actually shipped:

- Top-level scenario inventory table covering all 13 scenarios
  (I1–I11 + Rust↔Rust + Phase 4) with their committed branches.
- Phase 3 section documenting I5 hot-swap, I9 packet loss, and
  I10 long broadcast — all landed on this branch.
- I4 stereo (forward + reverse) and I8 SubscribeDrop documented
  under Phase 2.E follow-ups.
- Phase 4 (browser harness) and Phase 5 (browser-only scenarios)
  status pulled out of the bottom-of-file deferred list and
  documented properly.
- Stability section explaining the per-method relay reset + catalog
  retry fix for full-suite ordering flakes.
- CI integration section noting the live hang-interop job.
- Pending follow-ups list (framesPerGroup reconciliation, goAway
  production surface, post-reconnect listener cliff).

No code change.
2026-05-07 00:38:14 +00:00
..