Claude 116360b004 docs(nests-interop): T16 closure-roadmap Priority 3 closed (CI gating wired)
10/10 sweep × 22 tests = 220/220 hard-pass post-recalibration on
the merged branch (~5m 28s per sweep). Stability bar from
`2026-05-07-cross-stack-interop-ci-gating.md` met; both
`hang-interop` and `browser-interop` jobs in build.yml since
commit `21947bc5`.

Marks Priority 3 closed in:
- `2026-05-07-cross-stack-interop-ci-gating.md`
- `2026-05-07-t16-closure-roadmap.md`
- `2026-05-06-cross-stack-interop-test-results.md` (CI integration § wired)
- `2026-05-06-cross-stack-interop-test-gap-matrix.md` (history notes)

T16 closure roadmap is now done end-to-end:
- Priority 1  closed by `:quic` main merge (commit `8f8251a5`)
- Priority 2  closed by hard-floor tightening (commits `04be38ad`,
  `029329af`, `f8dc9c59`)
- Priority 3  closed by CI yaml + 10/10 stability (commit `21947bc5`)

Open follow-ups remain (browser hot-swap re-attach,
post-reconnect listener cliff, framesPerGroup production rerun)
but none block T16 closure.
2026-05-07 22:59:30 +00:00

6.0 KiB
Raw Blame History

Plan: wire CI gating for the cross-stack interop suite

Status: CLOSED 2026-05-07. Both jobs wired in commit 21947bc5 (path-tweaked from the original removed shape per the nestsClient/tests/browser-interop/ move). Stability-bar sweep: 10/10 BUILD SUCCESSFUL × 22 tests = 220/220 pass. Acceptance bar from the roadmap met.

Depended on:

  • 2026-05-07-moq-relay-routing-investigation.md closed ()
  • 2026-05-07-tighten-cross-stack-assertions.md closed ()
  • 10/10 sweep stability verified ()

This is the FINAL step of the T16 closure. With stable hard-pass suites, CI gating becomes safe and meaningful.

What's needed

A) .github/workflows/build.yml — the hang-interop job

The job was originally part of this branch but removed per maintainer ask in commit 6829ab727 ("ci(nests): drop hang-interop job from build.yml") because the suite was flaky. Resurrect the exact same shape:

hang-interop:
  needs: lint
  runs-on: ubuntu-latest
  timeout-minutes: 30
  steps:
    - uses: actions/checkout@v6
    - uses: actions/setup-java@v5
      with: { distribution: 'zulu', java-version: 21 }
    - uses: gradle/actions/setup-gradle@v4
      with:
        cache-read-only: ${{ github.ref != 'refs/heads/main' }}
    - uses: dtolnay/rust-toolchain@stable
    - uses: actions/cache@v4
      with:
        path: |
          ~/.cargo/registry
          ~/.cargo/git
          nestsClient/tests/hang-interop/target
          ~/.cache/amethyst-nests-interop/hang-interop-cargo
        key: ${{ runner.os }}-cargo-${{ hashFiles('nestsClient/tests/hang-interop/Cargo.lock', 'nestsClient/tests/hang-interop/REV') }}
        restore-keys: |
          ${{ runner.os }}-cargo-
    - name: Run cross-stack interop suite
      run: ./gradlew :nestsClient:jvmTest -DnestsHangInterop=true
    - uses: actions/upload-artifact@v7
      if: failure()
      with:
        name: Hang Interop Test Reports
        path: nestsClient/build/reports/tests/jvmTest/

The git show 6829ab727 -- .github/workflows/build.yml reverse gives the exact diff to re-add. Linux-only is correct: the cargo install of moq-relay 0.10.x has nontrivial native deps (aws-lc-sys, ring) that take 5+ min cold; cached runs ~30 s. macOS / Windows would double matrix cost without catching new defects.

B) .github/workflows/build.yml — the browser-interop job

Same shape as A, plus bun + Playwright caching:

browser-interop:
  needs: lint
  runs-on: ubuntu-latest
  timeout-minutes: 30
  steps:
    # ...same checkout + JDK + Gradle + Rust + cargo cache as hang-interop...
    - uses: oven-sh/setup-bun@v2
      with: { bun-version: 1.3.11 }
    - uses: actions/cache@v4
      with:
        path: |
          nestsClient/tests/browser-interop/node_modules
          nestsClient/tests/browser-interop/dist
        key: ${{ runner.os }}-bun-${{ hashFiles('nestsClient/tests/browser-interop/package.json', 'nestsClient/tests/browser-interop/bun.lock') }}
    - uses: actions/cache@v4
      with:
        path: ~/.cache/ms-playwright
        key: ${{ runner.os }}-playwright-${{ hashFiles('nestsClient/tests/browser-interop/package.json') }}
    - name: Run browser cross-stack interop suite
      run: |
        ./gradlew :nestsClient:jvmTest \
            --tests "com.vitorpamplona.nestsclient.interop.native.BrowserInteropTest" \
            -DnestsHangInterop=true \
            -DnestsBrowserInterop=true
    - uses: actions/upload-artifact@v7
      if: failure()
      with:
        name: Browser Interop Test Reports
        path: |
          nestsClient/build/reports/tests/jvmTest/
          nestsClient/tests/browser-interop/test-results/
          nestsClient/tests/browser-interop/playwright-report/

Same git show b94737de7 -- .github/workflows/build.yml reverse gives the exact diff (feat/nests-browser-interop's removal commit).

The existing nests-interop opt-in pattern already lives in cli/tests/nests/nests-interop.sh. Confirm both new jobs run in parallel with that without resource contention. They use different ports (NativeMoqRelayHarness reserves ServerSocket(0)) so they're independent at the network level.

Stability bar — verified

for i in 1..10; do
  ./gradlew :nestsClient:jvmTest \
    --tests HangInteropTest --tests BrowserInteropTest \
    -DnestsHangInterop=true -DnestsBrowserInterop=true --rerun-tasks
done

Result: 10/10 BUILD SUCCESSFUL × 22 tests = 220/220 pass. ~5m 28s steady state per sweep on the agent rig.

CI runtime budget

  • Hang-interop job: ~3-4 min on warm cache (one suite run, 60 s long-broadcast scenario dominates), ~8 min cold (cargo install moq-relay).
  • Browser-interop job: ~5-7 min warm (Chromium boot × N scenarios), ~10 min cold (Playwright install).
  • Both run in parallel after lint.

Total CI overhead: ~5-10 min on the critical path beyond the existing build matrix. Acceptable.

Documentation updates

After CI is green:

  1. nestsClient/plans/2026-05-06-cross-stack-interop-test-results.md — replace the "CI integration: Not wired" section with "wired, tracking flake-rate at 0/N runs".
  2. nestsClient/plans/2026-05-06-cross-stack-interop-test-gap-matrix.md — replace #6 CI integration: ⏸ deferred with ✅ live.
  3. Pick a maintainer to monitor the first 2 weeks of CI runs and bisect any new flake immediately (don't let it accumulate as "known flake" again).

Acceptance criteria

  • Both jobs added to build.yml and merge to main.
  • 10/10 sweep before merge.
  • First 2 weeks post-merge: ≥ 95% green rate. If lower, the routing investigation isn't really done — pull the jobs again until it is.

Optional follow-ups

  • Add I-12 GOAWAY scenario IF an IETF moq-transport target lands. Currently N/A in moq-lite-03 per cross-stack-interop-test-results.md's I12 section. If an IETF target ever ships, this is the cross-stack regression test.
  • Surface framesPerGroup as a per-deployment config if the framesPerGroup-rerun outcome shows the two rigs can't converge (see 2026-05-07-framespergroup-production-rerun.md).