32065901c8
Plans the path from 'infra shipped' to 'full coverage with correct behaviours'. Five new plan docs in nestsClient/plans/: 1. 2026-05-07-t16-closure-roadmap.md — index + priority order. Three sequential steps + one independent track. 2. 2026-05-07-moq-relay-routing-investigation.md (Priority 1) — root-cause the moq-relay 0.10.x per-broadcast subscribe- routing race. Step-by-step: capture relay-side trace, write minimum reproducer, file upstream OR bump moq-relay version. Smoking gun + hypotheses already in place from the late-join-flake investigation; this plan turns that into actionable next steps. 3. 2026-05-07-tighten-cross-stack-assertions.md (Priority 2) — once the routing race is closed, replace the five soft- pass scenarios in BrowserInteropTest with hard floors. Lists each scenario, its current soft-pass behavior, and the proposed hard threshold. 4. 2026-05-07-cross-stack-interop-ci-gating.md (Priority 3) — re-add the hang-interop + browser-interop GitHub Actions jobs that were dropped in6829ab727/b94737de7. Includes the exact YAML to restore and a 10/10 sweep stability bar before merge. 5. 2026-05-07-framespergroup-production-rerun.md (independent track) — re-run the HCgOY two-phone field tests against current nostrnests production at multiple framesPerGroup values to settle whether the test pin (5) and production default (50) can converge. Estimated total: 2.5-3.5 days of focused work to fully close T16. After these four: I7 post-reconnect cliff and I12 GOAWAY remain open as genuinely upstream-territory items, tracked in their existing investigation docs.
124 lines
4.8 KiB
Markdown
124 lines
4.8 KiB
Markdown
# T16 closure roadmap — full coverage with correct behaviours
|
||
|
||
**Goal state.** Every spec'd cross-stack scenario green in suite-mode
|
||
sweeps, asserting its full design intent (no soft-passes, no vacuous
|
||
threshold loosening), with CI gating live and stable.
|
||
|
||
**Where we are.** The merged `claude/cross-stack-interop-test-XAbYB`
|
||
branch ships 22 of 23 spec'd scenarios; each passes individually.
|
||
Suite-mode runs hit a residual moq-relay 0.10.x routing race on a
|
||
specific subset (~40-60% flake rate). Five scenarios soft-pass the
|
||
listener side as a known-flake mitigation. CI is intentionally
|
||
unwired pending stability.
|
||
|
||
This roadmap takes the suite from "passes individually" to "passes
|
||
in suite + CI" through three sequential plans. None should be
|
||
parallelized — each unblocks the next.
|
||
|
||
## Priority 1 — `2026-05-07-moq-relay-routing-investigation.md`
|
||
|
||
**Why first.** The race is the root cause of every soft-pass and
|
||
the reason CI isn't wired. Without resolving it, downstream plans
|
||
mask flake rather than catch regressions.
|
||
|
||
**What lands.**
|
||
- Either an upstream moq-relay version bump that closes the bug,
|
||
OR a documented relay configuration tweak that does.
|
||
- Or, if neither: a filed `kixelated/moq` issue with reproducer +
|
||
trace pair, plus a documented decision to keep CI unwired until
|
||
upstream resolves.
|
||
|
||
**Acceptance bar.** 5/5 sweep BUILD SUCCESSFUL on the existing
|
||
HangInteropTest + BrowserInteropTest with their CURRENT soft-pass
|
||
assertions intact. (The next step tightens those.)
|
||
|
||
## Priority 2 — `2026-05-07-tighten-cross-stack-assertions.md`
|
||
|
||
**Why second.** Once the suite is stable, every soft-pass that
|
||
returned vacuous-pass on listener-side 0-frame outcomes is now
|
||
HIDING regressions instead of side-stepping flakes. Replace each
|
||
with a hard floor.
|
||
|
||
**What lands.**
|
||
- Five BrowserInteropTest scenarios get hard sample-count + FFT
|
||
floors (or tightened existing ones).
|
||
- Gap matrix updated to reflect hard-pass coverage.
|
||
|
||
**Acceptance bar.** 5/5 sweep AGAIN, this time with hard
|
||
assertions. If anything fail-flakes, the routing investigation
|
||
isn't really done — loop back.
|
||
|
||
## Priority 3 — `2026-05-07-cross-stack-interop-ci-gating.md`
|
||
|
||
**Why third.** Stability + hard-asserts in place → CI is now a
|
||
net positive (catches regressions, doesn't burn maintainer time
|
||
on false reds).
|
||
|
||
**What lands.**
|
||
- Re-add `hang-interop` job (was at commit `6829ab727`'s parent;
|
||
`git show 6829ab727 -- .github/workflows/build.yml` reverse
|
||
gives the exact diff).
|
||
- Re-add `browser-interop` job (same pattern, plus bun +
|
||
Playwright caches).
|
||
- Documentation update across the results plan + gap matrix.
|
||
|
||
**Acceptance bar.** 10/10 sweep before merge; ≥ 95% CI green
|
||
rate over the first 2 weeks. If lower, the upstream race isn't
|
||
fully closed — pull the jobs.
|
||
|
||
## Independent track — `2026-05-07-framespergroup-production-rerun.md`
|
||
|
||
This one **doesn't block the closure roadmap**. It can run any
|
||
time after Priority 1 is done; it settles whether the test pin
|
||
(5) and production default (50) can converge, or whether they
|
||
must remain different. Either outcome is shippable.
|
||
|
||
**What lands.**
|
||
- Logcat data from a fresh two-phone field test against current
|
||
nostrnests production at multiple `framesPerGroup` values.
|
||
- A data-driven decision on whether to change the production
|
||
default, the test pin, or neither.
|
||
|
||
**Why it's parallelizable.** Doesn't gate the test suite or CI;
|
||
it gates a one-line code change to `NestMoqLiteBroadcaster`'s
|
||
default constant.
|
||
|
||
## After all four close — what remains
|
||
|
||
Two open items, both genuinely upstream:
|
||
|
||
1. **I7 post-reconnect listener cliff** —
|
||
`2026-05-07-i7-post-reconnect-cliff-investigation.md`. The I7
|
||
reverse scenario passes its 2.5 s threshold but a regression
|
||
test of "all post-reconnect data arrives" would require the
|
||
moq-relay 0.10.x per-broadcast forward queue fix. Same upstream
|
||
class as the routing race.
|
||
|
||
2. **I12 GOAWAY** — only re-emerges if an IETF moq-transport
|
||
target lands (currently moq-lite-03 only). Tracked in
|
||
`2026-05-06-cross-stack-interop-test-results.md`.
|
||
|
||
Beyond those: T16 reaches "full coverage with correct behaviours"
|
||
when this roadmap closes.
|
||
|
||
## Estimated wallclock
|
||
|
||
- Priority 1: 1–2 days (depends on whether upstream version bump
|
||
fixes it, or we have to file + wait for upstream).
|
||
- Priority 2: 0.5 day (mechanical replacement of soft-passes
|
||
with floors, plus rerun verification).
|
||
- Priority 3: 0.5 day (re-add CI jobs, run the 10× sweep, merge).
|
||
- Independent track (framesPerGroup): 0.5 day (needs prod-rig
|
||
access).
|
||
|
||
Total: 2.5–3.5 days of focused work to take T16 from "infra
|
||
shipped" to "fully closed".
|
||
|
||
## Plan files
|
||
|
||
- `2026-05-07-moq-relay-routing-investigation.md`
|
||
- `2026-05-07-tighten-cross-stack-assertions.md`
|
||
- `2026-05-07-cross-stack-interop-ci-gating.md`
|
||
- `2026-05-07-framespergroup-production-rerun.md`
|
||
- (this file) `2026-05-07-t16-closure-roadmap.md`
|