Claude 32065901c8 docs(nests): T16 closure roadmap + 4 follow-up plans
Plans the path from 'infra shipped' to 'full coverage with
correct behaviours'. Five new plan docs in nestsClient/plans/:

1. 2026-05-07-t16-closure-roadmap.md — index + priority order.
   Three sequential steps + one independent track.

2. 2026-05-07-moq-relay-routing-investigation.md (Priority 1)
   — root-cause the moq-relay 0.10.x per-broadcast subscribe-
   routing race. Step-by-step: capture relay-side trace, write
   minimum reproducer, file upstream OR bump moq-relay version.
   Smoking gun + hypotheses already in place from the
   late-join-flake investigation; this plan turns that into
   actionable next steps.

3. 2026-05-07-tighten-cross-stack-assertions.md (Priority 2)
   — once the routing race is closed, replace the five soft-
   pass scenarios in BrowserInteropTest with hard floors.
   Lists each scenario, its current soft-pass behavior, and
   the proposed hard threshold.

4. 2026-05-07-cross-stack-interop-ci-gating.md (Priority 3)
   — re-add the hang-interop + browser-interop GitHub Actions
   jobs that were dropped in 6829ab727 / b94737de7. Includes
   the exact YAML to restore and a 10/10 sweep stability bar
   before merge.

5. 2026-05-07-framespergroup-production-rerun.md (independent
   track) — re-run the HCgOY two-phone field tests against
   current nostrnests production at multiple framesPerGroup
   values to settle whether the test pin (5) and production
   default (50) can converge.

Estimated total: 2.5-3.5 days of focused work to fully close
T16. After these four: I7 post-reconnect cliff and I12 GOAWAY
remain open as genuinely upstream-territory items, tracked in
their existing investigation docs.