32065901c8
Plans the path from 'infra shipped' to 'full coverage with correct behaviours'. Five new plan docs in nestsClient/plans/: 1. 2026-05-07-t16-closure-roadmap.md — index + priority order. Three sequential steps + one independent track. 2. 2026-05-07-moq-relay-routing-investigation.md (Priority 1) — root-cause the moq-relay 0.10.x per-broadcast subscribe- routing race. Step-by-step: capture relay-side trace, write minimum reproducer, file upstream OR bump moq-relay version. Smoking gun + hypotheses already in place from the late-join-flake investigation; this plan turns that into actionable next steps. 3. 2026-05-07-tighten-cross-stack-assertions.md (Priority 2) — once the routing race is closed, replace the five soft- pass scenarios in BrowserInteropTest with hard floors. Lists each scenario, its current soft-pass behavior, and the proposed hard threshold. 4. 2026-05-07-cross-stack-interop-ci-gating.md (Priority 3) — re-add the hang-interop + browser-interop GitHub Actions jobs that were dropped in6829ab727/b94737de7. Includes the exact YAML to restore and a 10/10 sweep stability bar before merge. 5. 2026-05-07-framespergroup-production-rerun.md (independent track) — re-run the HCgOY two-phone field tests against current nostrnests production at multiple framesPerGroup values to settle whether the test pin (5) and production default (50) can converge. Estimated total: 2.5-3.5 days of focused work to fully close T16. After these four: I7 post-reconnect cliff and I12 GOAWAY remain open as genuinely upstream-territory items, tracked in their existing investigation docs.