Mirrors the existing nestsClient/tests/hang-interop/ layout — all T16 cross-stack interop test infrastructure (Rust sidecars + bun browser harness) now lives under nestsClient/tests/. Updates: - nestsClient/build.gradle.kts: browserInteropDir path. - PlaywrightDriver.kt + BrowserInteropTest.kt: kdoc comments. - All plan docs in nestsClient/plans/ that referenced the old path. Compiles clean post-move. No CI changes (those jobs are intentionally not wired per 2026-05-07-cross-stack-interop-ci-gating.md; when re-added they'll reference the new path).
172 lines
5.9 KiB
Markdown
172 lines
5.9 KiB
Markdown
# Plan: wire CI gating for the cross-stack interop suite
|
||
|
||
**Status:** specced — pickup ready.
|
||
**Depends on:**
|
||
- `2026-05-07-moq-relay-routing-investigation.md` closed
|
||
- `2026-05-07-tighten-cross-stack-assertions.md` closed
|
||
- 5/5 sweep stability verified
|
||
|
||
This is the FINAL step of the T16 closure. With stable hard-pass
|
||
suites, CI gating becomes safe and meaningful.
|
||
|
||
## What's needed
|
||
|
||
### A) `.github/workflows/build.yml` — the hang-interop job
|
||
|
||
The job was originally part of this branch but removed per
|
||
maintainer ask in commit `6829ab727` ("ci(nests): drop hang-interop
|
||
job from build.yml") because the suite was flaky. Resurrect the
|
||
exact same shape:
|
||
|
||
```yaml
|
||
hang-interop:
|
||
needs: lint
|
||
runs-on: ubuntu-latest
|
||
timeout-minutes: 30
|
||
steps:
|
||
- uses: actions/checkout@v6
|
||
- uses: actions/setup-java@v5
|
||
with: { distribution: 'zulu', java-version: 21 }
|
||
- uses: gradle/actions/setup-gradle@v4
|
||
with:
|
||
cache-read-only: ${{ github.ref != 'refs/heads/main' }}
|
||
- uses: dtolnay/rust-toolchain@stable
|
||
- uses: actions/cache@v4
|
||
with:
|
||
path: |
|
||
~/.cargo/registry
|
||
~/.cargo/git
|
||
nestsClient/tests/hang-interop/target
|
||
~/.cache/amethyst-nests-interop/hang-interop-cargo
|
||
key: ${{ runner.os }}-cargo-${{ hashFiles('nestsClient/tests/hang-interop/Cargo.lock', 'nestsClient/tests/hang-interop/REV') }}
|
||
restore-keys: |
|
||
${{ runner.os }}-cargo-
|
||
- name: Run cross-stack interop suite
|
||
run: ./gradlew :nestsClient:jvmTest -DnestsHangInterop=true
|
||
- uses: actions/upload-artifact@v7
|
||
if: failure()
|
||
with:
|
||
name: Hang Interop Test Reports
|
||
path: nestsClient/build/reports/tests/jvmTest/
|
||
```
|
||
|
||
The `git show 6829ab727 -- .github/workflows/build.yml` reverse
|
||
gives the exact diff to re-add. Linux-only is correct: the cargo
|
||
install of moq-relay 0.10.x has nontrivial native deps
|
||
(aws-lc-sys, ring) that take 5+ min cold; cached runs ~30 s.
|
||
macOS / Windows would double matrix cost without catching new
|
||
defects.
|
||
|
||
### B) `.github/workflows/build.yml` — the browser-interop job
|
||
|
||
Same shape as A, plus bun + Playwright caching:
|
||
|
||
```yaml
|
||
browser-interop:
|
||
needs: lint
|
||
runs-on: ubuntu-latest
|
||
timeout-minutes: 30
|
||
steps:
|
||
# ...same checkout + JDK + Gradle + Rust + cargo cache as hang-interop...
|
||
- uses: oven-sh/setup-bun@v2
|
||
with: { bun-version: 1.3.11 }
|
||
- uses: actions/cache@v4
|
||
with:
|
||
path: |
|
||
nestsClient/tests/browser-interop/node_modules
|
||
nestsClient/tests/browser-interop/dist
|
||
key: ${{ runner.os }}-bun-${{ hashFiles('nestsClient/tests/browser-interop/package.json', 'nestsClient/tests/browser-interop/bun.lock') }}
|
||
- uses: actions/cache@v4
|
||
with:
|
||
path: ~/.cache/ms-playwright
|
||
key: ${{ runner.os }}-playwright-${{ hashFiles('nestsClient/tests/browser-interop/package.json') }}
|
||
- name: Run browser cross-stack interop suite
|
||
run: |
|
||
./gradlew :nestsClient:jvmTest \
|
||
--tests "com.vitorpamplona.nestsclient.interop.native.BrowserInteropTest" \
|
||
-DnestsHangInterop=true \
|
||
-DnestsBrowserInterop=true
|
||
- uses: actions/upload-artifact@v7
|
||
if: failure()
|
||
with:
|
||
name: Browser Interop Test Reports
|
||
path: |
|
||
nestsClient/build/reports/tests/jvmTest/
|
||
nestsClient/tests/browser-interop/test-results/
|
||
nestsClient/tests/browser-interop/playwright-report/
|
||
```
|
||
|
||
Same `git show b94737de7 -- .github/workflows/build.yml` reverse
|
||
gives the exact diff (`feat/nests-browser-interop`'s removal
|
||
commit).
|
||
|
||
### C) Cross-link with `:cli` interop tests
|
||
|
||
The existing `nests-interop` opt-in pattern already lives in
|
||
`cli/tests/nests/nests-interop.sh`. Confirm both new jobs run
|
||
in parallel with that without resource contention. They use
|
||
different ports (NativeMoqRelayHarness reserves `ServerSocket(0)`)
|
||
so they're independent at the network level.
|
||
|
||
## Stability bar
|
||
|
||
Before flipping the CI switch, run:
|
||
|
||
```
|
||
for i in 1 2 3 4 5 6 7 8 9 10; do
|
||
echo "=== run $i ==="
|
||
./gradlew :nestsClient:jvmTest \
|
||
--tests HangInteropTest \
|
||
--tests BrowserInteropTest \
|
||
-DnestsHangInterop=true \
|
||
-DnestsBrowserInterop=true \
|
||
--rerun-tasks 2>&1 | grep -E "FAILED]|BUILD"
|
||
done
|
||
```
|
||
|
||
10/10 BUILD SUCCESSFUL. If even one fails, do NOT wire CI; loop
|
||
back to the routing investigation.
|
||
|
||
## CI runtime budget
|
||
|
||
- Hang-interop job: ~3-4 min on warm cache (one suite run, 60 s
|
||
long-broadcast scenario dominates), ~8 min cold (cargo install
|
||
moq-relay).
|
||
- Browser-interop job: ~5-7 min warm (Chromium boot × N
|
||
scenarios), ~10 min cold (Playwright install).
|
||
- Both run in parallel after `lint`.
|
||
|
||
Total CI overhead: ~5-10 min on the critical path beyond the
|
||
existing build matrix. Acceptable.
|
||
|
||
## Documentation updates
|
||
|
||
After CI is green:
|
||
|
||
1. `nestsClient/plans/2026-05-06-cross-stack-interop-test-results.md`
|
||
— replace the "CI integration: Not wired" section with "wired,
|
||
tracking flake-rate at 0/N runs".
|
||
2. `nestsClient/plans/2026-05-06-cross-stack-interop-test-gap-matrix.md`
|
||
— replace `#6 CI integration: ⏸ deferred` with `✅ live`.
|
||
3. Pick a maintainer to monitor the first 2 weeks of CI runs and
|
||
bisect any new flake immediately (don't let it accumulate as
|
||
"known flake" again).
|
||
|
||
## Acceptance criteria
|
||
|
||
- Both jobs added to `build.yml` and merge to main.
|
||
- 10/10 sweep before merge.
|
||
- First 2 weeks post-merge: ≥ 95% green rate. If lower, the
|
||
routing investigation isn't really done — pull the jobs again
|
||
until it is.
|
||
|
||
## Optional follow-ups
|
||
|
||
- **Add I-12 GOAWAY scenario IF an IETF moq-transport target lands.**
|
||
Currently N/A in moq-lite-03 per
|
||
`cross-stack-interop-test-results.md`'s I12 section. If an IETF
|
||
target ever ships, this is the cross-stack regression test.
|
||
- **Surface `framesPerGroup` as a per-deployment config** if the
|
||
framesPerGroup-rerun outcome shows the two rigs can't converge
|
||
(see `2026-05-07-framespergroup-production-rerun.md`).
|