Claude bd7b166fda chore(nests): mv nestsClient-browser-interop/ → nestsClient/tests/browser-interop/
Mirrors the existing nestsClient/tests/hang-interop/ layout — all
T16 cross-stack interop test infrastructure (Rust sidecars + bun
browser harness) now lives under nestsClient/tests/.

Updates:
- nestsClient/build.gradle.kts: browserInteropDir path.
- PlaywrightDriver.kt + BrowserInteropTest.kt: kdoc comments.
- All plan docs in nestsClient/plans/ that referenced the old
  path.

Compiles clean post-move. No CI changes (those jobs are
intentionally not wired per 2026-05-07-cross-stack-interop-ci-gating.md;
when re-added they'll reference the new path).
2026-05-07 14:43:55 +00:00

172 lines
5.9 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
# Plan: wire CI gating for the cross-stack interop suite
**Status:** specced — pickup ready.
**Depends on:**
- `2026-05-07-moq-relay-routing-investigation.md` closed
- `2026-05-07-tighten-cross-stack-assertions.md` closed
- 5/5 sweep stability verified
This is the FINAL step of the T16 closure. With stable hard-pass
suites, CI gating becomes safe and meaningful.
## What's needed
### A) `.github/workflows/build.yml` — the hang-interop job
The job was originally part of this branch but removed per
maintainer ask in commit `6829ab727` ("ci(nests): drop hang-interop
job from build.yml") because the suite was flaky. Resurrect the
exact same shape:
```yaml
hang-interop:
needs: lint
runs-on: ubuntu-latest
timeout-minutes: 30
steps:
- uses: actions/checkout@v6
- uses: actions/setup-java@v5
with: { distribution: 'zulu', java-version: 21 }
- uses: gradle/actions/setup-gradle@v4
with:
cache-read-only: ${{ github.ref != 'refs/heads/main' }}
- uses: dtolnay/rust-toolchain@stable
- uses: actions/cache@v4
with:
path: |
~/.cargo/registry
~/.cargo/git
nestsClient/tests/hang-interop/target
~/.cache/amethyst-nests-interop/hang-interop-cargo
key: ${{ runner.os }}-cargo-${{ hashFiles('nestsClient/tests/hang-interop/Cargo.lock', 'nestsClient/tests/hang-interop/REV') }}
restore-keys: |
${{ runner.os }}-cargo-
- name: Run cross-stack interop suite
run: ./gradlew :nestsClient:jvmTest -DnestsHangInterop=true
- uses: actions/upload-artifact@v7
if: failure()
with:
name: Hang Interop Test Reports
path: nestsClient/build/reports/tests/jvmTest/
```
The `git show 6829ab727 -- .github/workflows/build.yml` reverse
gives the exact diff to re-add. Linux-only is correct: the cargo
install of moq-relay 0.10.x has nontrivial native deps
(aws-lc-sys, ring) that take 5+ min cold; cached runs ~30 s.
macOS / Windows would double matrix cost without catching new
defects.
### B) `.github/workflows/build.yml` — the browser-interop job
Same shape as A, plus bun + Playwright caching:
```yaml
browser-interop:
needs: lint
runs-on: ubuntu-latest
timeout-minutes: 30
steps:
# ...same checkout + JDK + Gradle + Rust + cargo cache as hang-interop...
- uses: oven-sh/setup-bun@v2
with: { bun-version: 1.3.11 }
- uses: actions/cache@v4
with:
path: |
nestsClient/tests/browser-interop/node_modules
nestsClient/tests/browser-interop/dist
key: ${{ runner.os }}-bun-${{ hashFiles('nestsClient/tests/browser-interop/package.json', 'nestsClient/tests/browser-interop/bun.lock') }}
- uses: actions/cache@v4
with:
path: ~/.cache/ms-playwright
key: ${{ runner.os }}-playwright-${{ hashFiles('nestsClient/tests/browser-interop/package.json') }}
- name: Run browser cross-stack interop suite
run: |
./gradlew :nestsClient:jvmTest \
--tests "com.vitorpamplona.nestsclient.interop.native.BrowserInteropTest" \
-DnestsHangInterop=true \
-DnestsBrowserInterop=true
- uses: actions/upload-artifact@v7
if: failure()
with:
name: Browser Interop Test Reports
path: |
nestsClient/build/reports/tests/jvmTest/
nestsClient/tests/browser-interop/test-results/
nestsClient/tests/browser-interop/playwright-report/
```
Same `git show b94737de7 -- .github/workflows/build.yml` reverse
gives the exact diff (`feat/nests-browser-interop`'s removal
commit).
### C) Cross-link with `:cli` interop tests
The existing `nests-interop` opt-in pattern already lives in
`cli/tests/nests/nests-interop.sh`. Confirm both new jobs run
in parallel with that without resource contention. They use
different ports (NativeMoqRelayHarness reserves `ServerSocket(0)`)
so they're independent at the network level.
## Stability bar
Before flipping the CI switch, run:
```
for i in 1 2 3 4 5 6 7 8 9 10; do
echo "=== run $i ==="
./gradlew :nestsClient:jvmTest \
--tests HangInteropTest \
--tests BrowserInteropTest \
-DnestsHangInterop=true \
-DnestsBrowserInterop=true \
--rerun-tasks 2>&1 | grep -E "FAILED]|BUILD"
done
```
10/10 BUILD SUCCESSFUL. If even one fails, do NOT wire CI; loop
back to the routing investigation.
## CI runtime budget
- Hang-interop job: ~3-4 min on warm cache (one suite run, 60 s
long-broadcast scenario dominates), ~8 min cold (cargo install
moq-relay).
- Browser-interop job: ~5-7 min warm (Chromium boot × N
scenarios), ~10 min cold (Playwright install).
- Both run in parallel after `lint`.
Total CI overhead: ~5-10 min on the critical path beyond the
existing build matrix. Acceptable.
## Documentation updates
After CI is green:
1. `nestsClient/plans/2026-05-06-cross-stack-interop-test-results.md`
— replace the "CI integration: Not wired" section with "wired,
tracking flake-rate at 0/N runs".
2. `nestsClient/plans/2026-05-06-cross-stack-interop-test-gap-matrix.md`
— replace `#6 CI integration: ⏸ deferred` with `✅ live`.
3. Pick a maintainer to monitor the first 2 weeks of CI runs and
bisect any new flake immediately (don't let it accumulate as
"known flake" again).
## Acceptance criteria
- Both jobs added to `build.yml` and merge to main.
- 10/10 sweep before merge.
- First 2 weeks post-merge: ≥ 95% green rate. If lower, the
routing investigation isn't really done — pull the jobs again
until it is.
## Optional follow-ups
- **Add I-12 GOAWAY scenario IF an IETF moq-transport target lands.**
Currently N/A in moq-lite-03 per
`cross-stack-interop-test-results.md`'s I12 section. If an IETF
target ever ships, this is the cross-stack regression test.
- **Surface `framesPerGroup` as a per-deployment config** if the
framesPerGroup-rerun outcome shows the two rigs can't converge
(see `2026-05-07-framespergroup-production-rerun.md`).