Removes the `hang-interop` + `browser-interop` jobs from
`build.yml` (added in commit `21947bc5` after a 10/10 stability
sweep × 22 tests = 220/220 hard-pass). Cold-cache cost is
~10 min hang + ~13 min browser; warm-cache critical-path add
is ~6 min via the parallel browser job. Most PRs don't touch
audio / MoQ / QUIC, so paying that cost on every PR is
net-negative for the change-pattern the repo sees.
Adds `nestsClient/tests/README.md` covering:
- when to run (changes to nip53 / moq-lite session / audio
pipeline / MoqLiteNests* / ReconnectingNests* / :quic /
the sidecars themselves);
- quick-start gradle commands for hang-only, browser-only,
combined;
- prerequisites + first-run cache costs;
- all the configuration knobs (incl. the
`-DnestsHangInteropTraceRelay=true` trace-capture switch
added during the routing investigation);
- known limitations (hot-swap browser soft-pass,
framesPerGroup pin-vs-prod gap, I7 cycle 2 truncation);
- a 4-step debug recipe for triaging a flaking scenario.
Plan updates:
- `2026-05-07-t16-closure-roadmap.md` — Priority 3 marked
⏸ DEFERRED instead of ✅ CLOSED, pointing at the new README.
- `2026-05-07-cross-stack-interop-ci-gating.md` — status
changed to ⏸ DEFERRED; YAML shape preserved verbatim in the
plan for the next revisit.
- `2026-05-06-cross-stack-interop-test-results.md`,
`2026-05-06-cross-stack-interop-test-gap-matrix.md` — CI
integration § rewritten to "manual-run only" + README link.
The trace-capture instrumentation in `NativeMoqRelayHarness`
stays in place; it's useful for future flake triage even
without CI.
Mirrors the existing nestsClient/tests/hang-interop/ layout — all
T16 cross-stack interop test infrastructure (Rust sidecars + bun
browser harness) now lives under nestsClient/tests/.
Updates:
- nestsClient/build.gradle.kts: browserInteropDir path.
- PlaywrightDriver.kt + BrowserInteropTest.kt: kdoc comments.
- All plan docs in nestsClient/plans/ that referenced the old
path.
Compiles clean post-move. No CI changes (those jobs are
intentionally not wired per 2026-05-07-cross-stack-interop-ci-gating.md;
when re-added they'll reference the new path).
Plans the path from 'infra shipped' to 'full coverage with
correct behaviours'. Five new plan docs in nestsClient/plans/:
1. 2026-05-07-t16-closure-roadmap.md — index + priority order.
Three sequential steps + one independent track.
2. 2026-05-07-moq-relay-routing-investigation.md (Priority 1)
— root-cause the moq-relay 0.10.x per-broadcast subscribe-
routing race. Step-by-step: capture relay-side trace, write
minimum reproducer, file upstream OR bump moq-relay version.
Smoking gun + hypotheses already in place from the
late-join-flake investigation; this plan turns that into
actionable next steps.
3. 2026-05-07-tighten-cross-stack-assertions.md (Priority 2)
— once the routing race is closed, replace the five soft-
pass scenarios in BrowserInteropTest with hard floors.
Lists each scenario, its current soft-pass behavior, and
the proposed hard threshold.
4. 2026-05-07-cross-stack-interop-ci-gating.md (Priority 3)
— re-add the hang-interop + browser-interop GitHub Actions
jobs that were dropped in 6829ab727 / b94737de7. Includes
the exact YAML to restore and a 10/10 sweep stability bar
before merge.
5. 2026-05-07-framespergroup-production-rerun.md (independent
track) — re-run the HCgOY two-phone field tests against
current nostrnests production at multiple framesPerGroup
values to settle whether the test pin (5) and production
default (50) can converge.
Estimated total: 2.5-3.5 days of focused work to fully close
T16. After these four: I7 post-reconnect cliff and I12 GOAWAY
remain open as genuinely upstream-territory items, tracked in
their existing investigation docs.