Claude 15b8560547 ci(nests): defer cross-stack interop CI; document manual run
Removes the `hang-interop` + `browser-interop` jobs from
`build.yml` (added in commit `21947bc5` after a 10/10 stability
sweep × 22 tests = 220/220 hard-pass). Cold-cache cost is
~10 min hang + ~13 min browser; warm-cache critical-path add
is ~6 min via the parallel browser job. Most PRs don't touch
audio / MoQ / QUIC, so paying that cost on every PR is
net-negative for the change-pattern the repo sees.

Adds `nestsClient/tests/README.md` covering:
- when to run (changes to nip53 / moq-lite session / audio
  pipeline / MoqLiteNests* / ReconnectingNests* / :quic /
  the sidecars themselves);
- quick-start gradle commands for hang-only, browser-only,
  combined;
- prerequisites + first-run cache costs;
- all the configuration knobs (incl. the
  `-DnestsHangInteropTraceRelay=true` trace-capture switch
  added during the routing investigation);
- known limitations (hot-swap browser soft-pass,
  framesPerGroup pin-vs-prod gap, I7 cycle 2 truncation);
- a 4-step debug recipe for triaging a flaking scenario.

Plan updates:
- `2026-05-07-t16-closure-roadmap.md` — Priority 3 marked
  ⏸ DEFERRED instead of  CLOSED, pointing at the new README.
- `2026-05-07-cross-stack-interop-ci-gating.md` — status
  changed to ⏸ DEFERRED; YAML shape preserved verbatim in the
  plan for the next revisit.
- `2026-05-06-cross-stack-interop-test-results.md`,
  `2026-05-06-cross-stack-interop-test-gap-matrix.md` — CI
  integration § rewritten to "manual-run only" + README link.

The trace-capture instrumentation in `NativeMoqRelayHarness`
stays in place; it's useful for future flake triage even
without CI.
2026-05-07 23:18:31 +00:00
Claude 116360b004 docs(nests-interop): T16 closure-roadmap Priority 3 closed (CI gating wired)
10/10 sweep × 22 tests = 220/220 hard-pass post-recalibration on
the merged branch (~5m 28s per sweep). Stability bar from
`2026-05-07-cross-stack-interop-ci-gating.md` met; both
`hang-interop` and `browser-interop` jobs in build.yml since
commit `21947bc5`.

Marks Priority 3 closed in:
- `2026-05-07-cross-stack-interop-ci-gating.md`
- `2026-05-07-t16-closure-roadmap.md`
- `2026-05-06-cross-stack-interop-test-results.md` (CI integration § wired)
- `2026-05-06-cross-stack-interop-test-gap-matrix.md` (history notes)

T16 closure roadmap is now done end-to-end:
- Priority 1  closed by `:quic` main merge (commit `8f8251a5`)
- Priority 2  closed by hard-floor tightening (commits `04be38ad`,
  `029329af`, `f8dc9c59`)
- Priority 3  closed by CI yaml + 10/10 stability (commit `21947bc5`)

Open follow-ups remain (browser hot-swap re-attach,
post-reconnect listener cliff, framesPerGroup production rerun)
but none block T16 closure.
2026-05-07 22:59:30 +00:00
Claude bd7b166fda chore(nests): mv nestsClient-browser-interop/ → nestsClient/tests/browser-interop/
Mirrors the existing nestsClient/tests/hang-interop/ layout — all
T16 cross-stack interop test infrastructure (Rust sidecars + bun
browser harness) now lives under nestsClient/tests/.

Updates:
- nestsClient/build.gradle.kts: browserInteropDir path.
- PlaywrightDriver.kt + BrowserInteropTest.kt: kdoc comments.
- All plan docs in nestsClient/plans/ that referenced the old
  path.

Compiles clean post-move. No CI changes (those jobs are
intentionally not wired per 2026-05-07-cross-stack-interop-ci-gating.md;
when re-added they'll reference the new path).
2026-05-07 14:43:55 +00:00
Claude 32065901c8 docs(nests): T16 closure roadmap + 4 follow-up plans
Plans the path from 'infra shipped' to 'full coverage with
correct behaviours'. Five new plan docs in nestsClient/plans/:

1. 2026-05-07-t16-closure-roadmap.md — index + priority order.
   Three sequential steps + one independent track.

2. 2026-05-07-moq-relay-routing-investigation.md (Priority 1)
   — root-cause the moq-relay 0.10.x per-broadcast subscribe-
   routing race. Step-by-step: capture relay-side trace, write
   minimum reproducer, file upstream OR bump moq-relay version.
   Smoking gun + hypotheses already in place from the
   late-join-flake investigation; this plan turns that into
   actionable next steps.

3. 2026-05-07-tighten-cross-stack-assertions.md (Priority 2)
   — once the routing race is closed, replace the five soft-
   pass scenarios in BrowserInteropTest with hard floors.
   Lists each scenario, its current soft-pass behavior, and
   the proposed hard threshold.

4. 2026-05-07-cross-stack-interop-ci-gating.md (Priority 3)
   — re-add the hang-interop + browser-interop GitHub Actions
   jobs that were dropped in 6829ab727 / b94737de7. Includes
   the exact YAML to restore and a 10/10 sweep stability bar
   before merge.

5. 2026-05-07-framespergroup-production-rerun.md (independent
   track) — re-run the HCgOY two-phone field tests against
   current nostrnests production at multiple framesPerGroup
   values to settle whether the test pin (5) and production
   default (50) can converge.

Estimated total: 2.5-3.5 days of focused work to fully close
T16. After these four: I7 post-reconnect cliff and I12 GOAWAY
remain open as genuinely upstream-territory items, tracked in
their existing investigation docs.