Claude 15b8560547 ci(nests): defer cross-stack interop CI; document manual run
Removes the `hang-interop` + `browser-interop` jobs from
`build.yml` (added in commit `21947bc5` after a 10/10 stability
sweep × 22 tests = 220/220 hard-pass). Cold-cache cost is
~10 min hang + ~13 min browser; warm-cache critical-path add
is ~6 min via the parallel browser job. Most PRs don't touch
audio / MoQ / QUIC, so paying that cost on every PR is
net-negative for the change-pattern the repo sees.

Adds `nestsClient/tests/README.md` covering:
- when to run (changes to nip53 / moq-lite session / audio
  pipeline / MoqLiteNests* / ReconnectingNests* / :quic /
  the sidecars themselves);
- quick-start gradle commands for hang-only, browser-only,
  combined;
- prerequisites + first-run cache costs;
- all the configuration knobs (incl. the
  `-DnestsHangInteropTraceRelay=true` trace-capture switch
  added during the routing investigation);
- known limitations (hot-swap browser soft-pass,
  framesPerGroup pin-vs-prod gap, I7 cycle 2 truncation);
- a 4-step debug recipe for triaging a flaking scenario.

Plan updates:
- `2026-05-07-t16-closure-roadmap.md` — Priority 3 marked
  ⏸ DEFERRED instead of  CLOSED, pointing at the new README.
- `2026-05-07-cross-stack-interop-ci-gating.md` — status
  changed to ⏸ DEFERRED; YAML shape preserved verbatim in the
  plan for the next revisit.
- `2026-05-06-cross-stack-interop-test-results.md`,
  `2026-05-06-cross-stack-interop-test-gap-matrix.md` — CI
  integration § rewritten to "manual-run only" + README link.

The trace-capture instrumentation in `NativeMoqRelayHarness`
stays in place; it's useful for future flake triage even
without CI.
2026-05-07 23:18:31 +00:00

6.4 KiB
Raw Blame History

Plan: wire CI gating for the cross-stack interop suite

Status: ⏸ DEFERRED 2026-05-07. The infrastructure to wire CI is ready — both jobs landed in commit 21947bc5 and a 10/10 stability sweep × 22 tests = 220/220 passed on the agent rig. A maintainer review then judged the wallclock cost too high for the change-pattern and removed the jobs (cold cache: ~10 min hang, ~13 min browser; most PRs don't touch audio / MoQ / QUIC).

The suites are now run manually before merging changes that touch the relevant code paths. Developer-facing docs: ../tests/README.md. This plan stays in the tree for the next time someone wants to revisit CI gating — the YAML shapes below are the exact reverse-merge target, and the stability bar (10/10 sweep) has already been demonstrated on this branch.

Depended on:

  • 2026-05-07-moq-relay-routing-investigation.md closed ()
  • 2026-05-07-tighten-cross-stack-assertions.md closed ()
  • 10/10 sweep stability verified ()

What's needed

A) .github/workflows/build.yml — the hang-interop job

The job was originally part of this branch but removed per maintainer ask in commit 6829ab727 ("ci(nests): drop hang-interop job from build.yml") because the suite was flaky. Resurrect the exact same shape:

hang-interop:
  needs: lint
  runs-on: ubuntu-latest
  timeout-minutes: 30
  steps:
    - uses: actions/checkout@v6
    - uses: actions/setup-java@v5
      with: { distribution: 'zulu', java-version: 21 }
    - uses: gradle/actions/setup-gradle@v4
      with:
        cache-read-only: ${{ github.ref != 'refs/heads/main' }}
    - uses: dtolnay/rust-toolchain@stable
    - uses: actions/cache@v4
      with:
        path: |
          ~/.cargo/registry
          ~/.cargo/git
          nestsClient/tests/hang-interop/target
          ~/.cache/amethyst-nests-interop/hang-interop-cargo
        key: ${{ runner.os }}-cargo-${{ hashFiles('nestsClient/tests/hang-interop/Cargo.lock', 'nestsClient/tests/hang-interop/REV') }}
        restore-keys: |
          ${{ runner.os }}-cargo-
    - name: Run cross-stack interop suite
      run: ./gradlew :nestsClient:jvmTest -DnestsHangInterop=true
    - uses: actions/upload-artifact@v7
      if: failure()
      with:
        name: Hang Interop Test Reports
        path: nestsClient/build/reports/tests/jvmTest/

The git show 6829ab727 -- .github/workflows/build.yml reverse gives the exact diff to re-add. Linux-only is correct: the cargo install of moq-relay 0.10.x has nontrivial native deps (aws-lc-sys, ring) that take 5+ min cold; cached runs ~30 s. macOS / Windows would double matrix cost without catching new defects.

B) .github/workflows/build.yml — the browser-interop job

Same shape as A, plus bun + Playwright caching:

browser-interop:
  needs: lint
  runs-on: ubuntu-latest
  timeout-minutes: 30
  steps:
    # ...same checkout + JDK + Gradle + Rust + cargo cache as hang-interop...
    - uses: oven-sh/setup-bun@v2
      with: { bun-version: 1.3.11 }
    - uses: actions/cache@v4
      with:
        path: |
          nestsClient/tests/browser-interop/node_modules
          nestsClient/tests/browser-interop/dist
        key: ${{ runner.os }}-bun-${{ hashFiles('nestsClient/tests/browser-interop/package.json', 'nestsClient/tests/browser-interop/bun.lock') }}
    - uses: actions/cache@v4
      with:
        path: ~/.cache/ms-playwright
        key: ${{ runner.os }}-playwright-${{ hashFiles('nestsClient/tests/browser-interop/package.json') }}
    - name: Run browser cross-stack interop suite
      run: |
        ./gradlew :nestsClient:jvmTest \
            --tests "com.vitorpamplona.nestsclient.interop.native.BrowserInteropTest" \
            -DnestsHangInterop=true \
            -DnestsBrowserInterop=true
    - uses: actions/upload-artifact@v7
      if: failure()
      with:
        name: Browser Interop Test Reports
        path: |
          nestsClient/build/reports/tests/jvmTest/
          nestsClient/tests/browser-interop/test-results/
          nestsClient/tests/browser-interop/playwright-report/

Same git show b94737de7 -- .github/workflows/build.yml reverse gives the exact diff (feat/nests-browser-interop's removal commit).

The existing nests-interop opt-in pattern already lives in cli/tests/nests/nests-interop.sh. Confirm both new jobs run in parallel with that without resource contention. They use different ports (NativeMoqRelayHarness reserves ServerSocket(0)) so they're independent at the network level.

Stability bar — verified

for i in 1..10; do
  ./gradlew :nestsClient:jvmTest \
    --tests HangInteropTest --tests BrowserInteropTest \
    -DnestsHangInterop=true -DnestsBrowserInterop=true --rerun-tasks
done

Result: 10/10 BUILD SUCCESSFUL × 22 tests = 220/220 pass. ~5m 28s steady state per sweep on the agent rig.

CI runtime budget

  • Hang-interop job: ~3-4 min on warm cache (one suite run, 60 s long-broadcast scenario dominates), ~8 min cold (cargo install moq-relay).
  • Browser-interop job: ~5-7 min warm (Chromium boot × N scenarios), ~10 min cold (Playwright install).
  • Both run in parallel after lint.

Total CI overhead: ~5-10 min on the critical path beyond the existing build matrix. Acceptable.

Documentation updates

After CI is green:

  1. nestsClient/plans/2026-05-06-cross-stack-interop-test-results.md — replace the "CI integration: Not wired" section with "wired, tracking flake-rate at 0/N runs".
  2. nestsClient/plans/2026-05-06-cross-stack-interop-test-gap-matrix.md — replace #6 CI integration: ⏸ deferred with ✅ live.
  3. Pick a maintainer to monitor the first 2 weeks of CI runs and bisect any new flake immediately (don't let it accumulate as "known flake" again).

Acceptance criteria

  • Both jobs added to build.yml and merge to main.
  • 10/10 sweep before merge.
  • First 2 weeks post-merge: ≥ 95% green rate. If lower, the routing investigation isn't really done — pull the jobs again until it is.

Optional follow-ups

  • Add I-12 GOAWAY scenario IF an IETF moq-transport target lands. Currently N/A in moq-lite-03 per cross-stack-interop-test-results.md's I12 section. If an IETF target ever ships, this is the cross-stack regression test.
  • Surface framesPerGroup as a per-deployment config if the framesPerGroup-rerun outcome shows the two rigs can't converge (see 2026-05-07-framespergroup-production-rerun.md).