Claude 15b8560547 ci(nests): defer cross-stack interop CI; document manual run
Removes the `hang-interop` + `browser-interop` jobs from
`build.yml` (added in commit `21947bc5` after a 10/10 stability
sweep × 22 tests = 220/220 hard-pass). Cold-cache cost is
~10 min hang + ~13 min browser; warm-cache critical-path add
is ~6 min via the parallel browser job. Most PRs don't touch
audio / MoQ / QUIC, so paying that cost on every PR is
net-negative for the change-pattern the repo sees.

Adds `nestsClient/tests/README.md` covering:
- when to run (changes to nip53 / moq-lite session / audio
  pipeline / MoqLiteNests* / ReconnectingNests* / :quic /
  the sidecars themselves);
- quick-start gradle commands for hang-only, browser-only,
  combined;
- prerequisites + first-run cache costs;
- all the configuration knobs (incl. the
  `-DnestsHangInteropTraceRelay=true` trace-capture switch
  added during the routing investigation);
- known limitations (hot-swap browser soft-pass,
  framesPerGroup pin-vs-prod gap, I7 cycle 2 truncation);
- a 4-step debug recipe for triaging a flaking scenario.

Plan updates:
- `2026-05-07-t16-closure-roadmap.md` — Priority 3 marked
  ⏸ DEFERRED instead of  CLOSED, pointing at the new README.
- `2026-05-07-cross-stack-interop-ci-gating.md` — status
  changed to ⏸ DEFERRED; YAML shape preserved verbatim in the
  plan for the next revisit.
- `2026-05-06-cross-stack-interop-test-results.md`,
  `2026-05-06-cross-stack-interop-test-gap-matrix.md` — CI
  integration § rewritten to "manual-run only" + README link.

The trace-capture instrumentation in `NativeMoqRelayHarness`
stays in place; it's useful for future flake triage even
without CI.
2026-05-07 23:18:31 +00:00

178 lines
6.4 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
# Plan: wire CI gating for the cross-stack interop suite
**Status:** ⏸ DEFERRED 2026-05-07.
The infrastructure to wire CI is ready — both jobs landed in
commit `21947bc5` and a 10/10 stability sweep × 22 tests =
220/220 passed on the agent rig. A maintainer review then
judged the wallclock cost too high for the change-pattern and
removed the jobs (cold cache: ~10 min hang, ~13 min browser;
most PRs don't touch audio / MoQ / QUIC).
The suites are now run manually before merging changes that
touch the relevant code paths. Developer-facing docs:
[`../tests/README.md`](../tests/README.md). This plan stays
in the tree for the next time someone wants to revisit CI
gating — the YAML shapes below are the exact reverse-merge
target, and the stability bar (10/10 sweep) has already been
demonstrated on this branch.
**Depended on:**
- `2026-05-07-moq-relay-routing-investigation.md` closed (✅)
- `2026-05-07-tighten-cross-stack-assertions.md` closed (✅)
- 10/10 sweep stability verified (✅)
## What's needed
### A) `.github/workflows/build.yml` — the hang-interop job
The job was originally part of this branch but removed per
maintainer ask in commit `6829ab727` ("ci(nests): drop hang-interop
job from build.yml") because the suite was flaky. Resurrect the
exact same shape:
```yaml
hang-interop:
needs: lint
runs-on: ubuntu-latest
timeout-minutes: 30
steps:
- uses: actions/checkout@v6
- uses: actions/setup-java@v5
with: { distribution: 'zulu', java-version: 21 }
- uses: gradle/actions/setup-gradle@v4
with:
cache-read-only: ${{ github.ref != 'refs/heads/main' }}
- uses: dtolnay/rust-toolchain@stable
- uses: actions/cache@v4
with:
path: |
~/.cargo/registry
~/.cargo/git
nestsClient/tests/hang-interop/target
~/.cache/amethyst-nests-interop/hang-interop-cargo
key: ${{ runner.os }}-cargo-${{ hashFiles('nestsClient/tests/hang-interop/Cargo.lock', 'nestsClient/tests/hang-interop/REV') }}
restore-keys: |
${{ runner.os }}-cargo-
- name: Run cross-stack interop suite
run: ./gradlew :nestsClient:jvmTest -DnestsHangInterop=true
- uses: actions/upload-artifact@v7
if: failure()
with:
name: Hang Interop Test Reports
path: nestsClient/build/reports/tests/jvmTest/
```
The `git show 6829ab727 -- .github/workflows/build.yml` reverse
gives the exact diff to re-add. Linux-only is correct: the cargo
install of moq-relay 0.10.x has nontrivial native deps
(aws-lc-sys, ring) that take 5+ min cold; cached runs ~30 s.
macOS / Windows would double matrix cost without catching new
defects.
### B) `.github/workflows/build.yml` — the browser-interop job
Same shape as A, plus bun + Playwright caching:
```yaml
browser-interop:
needs: lint
runs-on: ubuntu-latest
timeout-minutes: 30
steps:
# ...same checkout + JDK + Gradle + Rust + cargo cache as hang-interop...
- uses: oven-sh/setup-bun@v2
with: { bun-version: 1.3.11 }
- uses: actions/cache@v4
with:
path: |
nestsClient/tests/browser-interop/node_modules
nestsClient/tests/browser-interop/dist
key: ${{ runner.os }}-bun-${{ hashFiles('nestsClient/tests/browser-interop/package.json', 'nestsClient/tests/browser-interop/bun.lock') }}
- uses: actions/cache@v4
with:
path: ~/.cache/ms-playwright
key: ${{ runner.os }}-playwright-${{ hashFiles('nestsClient/tests/browser-interop/package.json') }}
- name: Run browser cross-stack interop suite
run: |
./gradlew :nestsClient:jvmTest \
--tests "com.vitorpamplona.nestsclient.interop.native.BrowserInteropTest" \
-DnestsHangInterop=true \
-DnestsBrowserInterop=true
- uses: actions/upload-artifact@v7
if: failure()
with:
name: Browser Interop Test Reports
path: |
nestsClient/build/reports/tests/jvmTest/
nestsClient/tests/browser-interop/test-results/
nestsClient/tests/browser-interop/playwright-report/
```
Same `git show b94737de7 -- .github/workflows/build.yml` reverse
gives the exact diff (`feat/nests-browser-interop`'s removal
commit).
### C) Cross-link with `:cli` interop tests
The existing `nests-interop` opt-in pattern already lives in
`cli/tests/nests/nests-interop.sh`. Confirm both new jobs run
in parallel with that without resource contention. They use
different ports (NativeMoqRelayHarness reserves `ServerSocket(0)`)
so they're independent at the network level.
## Stability bar — verified ✅
```
for i in 1..10; do
./gradlew :nestsClient:jvmTest \
--tests HangInteropTest --tests BrowserInteropTest \
-DnestsHangInterop=true -DnestsBrowserInterop=true --rerun-tasks
done
```
Result: **10/10 BUILD SUCCESSFUL × 22 tests = 220/220 pass.**
~5m 28s steady state per sweep on the agent rig.
## CI runtime budget
- Hang-interop job: ~3-4 min on warm cache (one suite run, 60 s
long-broadcast scenario dominates), ~8 min cold (cargo install
moq-relay).
- Browser-interop job: ~5-7 min warm (Chromium boot × N
scenarios), ~10 min cold (Playwright install).
- Both run in parallel after `lint`.
Total CI overhead: ~5-10 min on the critical path beyond the
existing build matrix. Acceptable.
## Documentation updates
After CI is green:
1. `nestsClient/plans/2026-05-06-cross-stack-interop-test-results.md`
— replace the "CI integration: Not wired" section with "wired,
tracking flake-rate at 0/N runs".
2. `nestsClient/plans/2026-05-06-cross-stack-interop-test-gap-matrix.md`
— replace `#6 CI integration: ⏸ deferred` with `✅ live`.
3. Pick a maintainer to monitor the first 2 weeks of CI runs and
bisect any new flake immediately (don't let it accumulate as
"known flake" again).
## Acceptance criteria
- Both jobs added to `build.yml` and merge to main.
- 10/10 sweep before merge.
- First 2 weeks post-merge: ≥ 95% green rate. If lower, the
routing investigation isn't really done — pull the jobs again
until it is.
## Optional follow-ups
- **Add I-12 GOAWAY scenario IF an IETF moq-transport target lands.**
Currently N/A in moq-lite-03 per
`cross-stack-interop-test-results.md`'s I12 section. If an IETF
target ever ships, this is the cross-stack regression test.
- **Surface `framesPerGroup` as a per-deployment config** if the
framesPerGroup-rerun outcome shows the two rigs can't converge
(see `2026-05-07-framespergroup-production-rerun.md`).